Prepare useful site information
Collect process descriptions, flow measurements, analysis results, equipment records and layout drawings. Explain the operational problem and the required outcome.
Compare like-for-like proposals
Check the design basis, included equipment, utilities, civil work and interfaces. Identify responsibility for installation, testing, operator training and handover documents.
Plan for the operating life
Discuss routine inspections, consumables, spare parts and troubleshooting support. Evaluate the ability to monitor performance and maintain the system, alongside initial project cost.
